The CDD is prepared during the Technology Maturation and Risk Reduction (TMRR) acquisition phase and defines measurable and testable capabilities to guide the Engineering and Manufacturing Development (EMD) acquisition phase.
What are capability documents?
A capability statement is a concise, one page document of your business competencies. Think of it as your business’s resume. Its purpose is to provide specific information that will convince potential customers to do business with you. When written well, it will differentiate your business from the competition!
What is a capability production document?
The Capability Production Document (CPD) identifies production attributes for a single increment of a program. The CPD is rewritten for each increment in an evolutionary acquisition program. Key Performance Parameters (KPP) and performance attributes are refined in the CPD.
What is initial capabilities document?
A category of capability requirements documents that specifies one or more capability requirements and associated capability gaps that represent unacceptable operational risk if left unmitigated.
What is a CDD in DOD?
The Capability Development Document (CDD) specifies the operational requirements for the system that will deliver the capability that meets operational performance criteria specified in the Initial Capabilities Document (ICD).
Who validates capability requirements?
The JROC You may also read,
Which capability document captures the system that will get produced?
The Capability Production Document (CPD) captures the information necessary to support production, testing, and deployment of an affordable and supportable increment within an acquisition strategy. Check the answer of
What are two outputs of the TMRR phase?
What are two outputs of the Technology Maturation and Risk Reduction (TMRR) phase? a. Capability Development Document (CDD) and Reliability, Availability, and Maintainability Cost Report (RAM_C).
What builds upon the initial capabilities document?
Once approved, the ICD is not updated. The ICD defines the gap in terms of the functional area; the relevant range of military operations; desired effects; time and DOTMLPF; and policy implications and constraints. Read:
What is the Jcids process?
The Joint Capabilities Integration and Development System (JCIDS), is the formal United States Department of Defense (DoD) process which defines acquisition requirements and evaluation criteria for future defense programs.
What is a CDD acquisition?
The CDD is prepared during the Technology Maturation and Risk Reduction (TMRR) acquisition phase and defines measurable and testable capabilities to guide the Engineering and Manufacturing Development (EMD) acquisition phase.
Who can initiate a capability based assessment?
Who can initiate a Capability Based-Assessment (CBA)? Any Department of Defense (DoD) Organization.
What is CDD in army?
The Capability Development Document (CDD) specifies the operational requirements for the system that will deliver the capability that meets operational performance criteria specified in the Initial Capabilities Document (ICD). … The CDD identifies the operational performance attributes of the proposed system.
What are the four mandatory key performance parameters?
4, the new JCIDS
What is the DOD acquisition process?
The Acquisition Process is the management process of a defense program. It’s an event based process where a defense program goes thru a series of processes, milestones and reviews from beginning to end. Each milestone is the culmination of a phase were it’s determined if a program will proceed into the next phase.